This is a sample field note. Content quality does not matter if half the fleet is offline when the cohort arrives.
Treat the fleet like production kit
- Inventory serials, site assignment, and warranty status.
- Define a charging and sanitisation checklist between sessions.
- Pin firmware versions and test upgrades on a canary subset first.
Completion data must leave the room
LMS or LRS sync should be verified as part of session close-out, not left to overnight hope. If connectivity fails, define a retry path and who owns the backlog.





